Normally, 3 hour, I will support you at same time to do the modfication.
The previous start to work at 9:00pm to 12:00pm (first class)
then 2:00pm-5:00pm at final class.
According to the timing analysis on last class.
Power supply --> 1 hour
Chassics drilling --> 30 min
Main board --> Desolder the SMD cap--> 5 min. (we have special tools, fast and safe)
Main board --> soldering back the cap --> 1 hour. (23 capacitor)
Tuner board --> 1 hour (11 capacitor)